Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.12985127

- Product Categories
- Friendly Links
Information Name: | Track clay |
Published: | 2014-04-08 |
Validity: | 365 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | ★ Features: 1, early strength and high strength: one day strength up to 30MPa or more. 2, the flow state: flow of up to 290-330mm, can fill all the gaps and meet the requirements of secondary grouting. 3, no shrinkage: to ensure close integration between devices and infrastructure. 4, the construction of low-temperature: -10 ℃ temperatures allow for outdoor construction. 5, the insulation resistance: high density structure after curing has good insulating properties and impermeability. 6, durability: This product is an inorganic cementitious materials, life is more than the life of the foundation concrete. After a million times fatigue test, 200 freeze-thaw cycle experiments no significant changes in intensity. 30 days immersed in the oil intensity has improved significantly. ★ Uses: 1, ports, docks crane rail tank filling. (Rail clips grout, floor, bolts, etc.). 2, for a variety of mechanical and electrical equipment (heavy equipment, high-precision grinding machines) a secondary grouting. 3, steel structure installation works. 4, civil construction reinforcement. ★ Specifications: Performance Project test results vertical expansion (%) 1d 0.34 fluidity (mm) 320 flexural strength (Mpa) 1d 5.5 3d 10.8 28d 15.5 Compressive Strength (Mpa) 1d 32.60 3d 60.10 28d 75.30 ★ construction points : (a) the basis of treatment and support mold: 1, chiseling concrete base surface, and clean up. Member and HYG-100T track clay bonded together (eg steel plate) will rust and oil and other skin removed. 2, in the four hours before watering HYG-100T clay track, is applied to the underlying concrete surface moist, may not have water when watering. 3, baffles should branch located tight to prevent leakage of plasma. (B) Filling: 1, add water: According to the bag (25kg) ratio of 4 ~ 4.5kg of water for mixing with water, such as the construction does not require a large degree can be a corresponding reduction in the flow of water. 2, the mixing procedure: After stirring a predetermined amount of the water bucket into the blender, the seat part into the barrel stirred dilute slurry, and then excess material into the mixing time should be controlled from the beginning to the end of one minute about. 3, stirring blades should move slowly up and down along the periphery of the barrel to make the bottom of the barrel and the barrel wall adhesion of dry material to mixing; mixing blades shall provide to the seat above the slurry level in order to avoid air into the seat syrup material inside. 4, mixing well HYG-100T track clay timely watering. When watering, as far as possible from the side of the injection, in order to facilitate the discharge of air between the floor and the concrete foundation. When necessary, bamboo and other tools can be used diversion. After continuous watering must begin without interruption. ★ mixer with: ① double handle hand drill, power ≥ 450W, speed ≥ 500r/min. ② mixing blades made of δ = 1.2mm thick steel blade φ150mm, stirring rod φ12mm round. ★ Note: When field use is strictly prohibited incorporation of any additives, in admixture in cement. Not be used with other manufacturers of similar product mix to ensure project quality. ★ conservation: 1, with wet straw or cloth covering HYG-100T has a good watering clay on the track, and sprinkler maintenance, 2-6 times a day. 2, the curing temperature should be above 15 ℃, curing period of 7 days. Maintenance period may be extended if the temperature is low spot. 3, winter construction insulation measures to be taken. ★ Chaimo: form removal should be completed in 24 hours after watering, after form removal continued conservation. ★ Packaging and storage: Packing of 25kg ± 0.5kg, composite paper bag lined with plastic bag. Store in a dry, cool place, without the moisture stored at the storage period of three months. Need to recheck extended before use after passing. |
Admin>>>
You are the 16386 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Jiaxin Jie Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16386 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Jiaxin Jie Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility